Cellular · DAS Los Angeles

DAS installation in Los Angeles

Multi-carrier cellular coverage and emergency responder radio systems for buildings across Los Angeles County.

Updated October 2026 · CSLB #819788, C-7, C-10, C-28

The short answer

WCC designs and installs distributed antenna systems (DAS) in Los Angeles and across Los Angeles County: multi-carrier cellular coverage for AT&T, Verizon and T-Mobile, and emergency responder radio coverage systems (ERRCS) for fire code compliance. Cellular DAS typically runs $2 to $4 per square foot and ERRCS $1 to $3 per square foot.

Cellular DAS$2–$4Per sq ft
ERRCS$1–$3Per sq ft
CarriersMulti-carrierAT&T, Verizon, T-Mobile

The problem

Why LA buildings lose signal

Steel, concrete and low-E glass block cellular signal, so dead zones show up in conference rooms, stairwells, elevators, basements and parking structures. It isn't a carrier problem you can call in; the fix is a system designed for your building. For public safety radios, many jurisdictions in Los Angeles County, including the City of Los Angeles, require an ERRCS in buildings where first responders can't get a usable signal, and a failed fire inspection can hold up occupancy.

Systems

DAS and ERRCS options

SystemWhat it isBest for
Passive DASA signal source and amplifier feeding a network of coax and antennasSmall and mid-size buildings
Active and hybrid DASFiber-fed remote units for consistent signal across large footprintsHospitals, high-rises, campuses
ERRCS (public safety BDA)Amplifiers and antennas that carry first responder radio channels indoorsCode compliance and fire inspections
Small cellsCarrier-owned units for targeted capacityHigh-density spots, with carrier approval

Signal boosters and DAS that rebroadcast carrier signal need carrier consent and must meet FCC rules. We coordinate those approvals as part of the project.

Who we serve

Buildings we cover in Los Angeles

Hospitals and medical offices

Clinical coverage for staff phones and pagers, plus ERRCS for inspections. Healthcare DAS

Offices and high-rises

Multi-carrier coverage on every floor, elevator and parking level. Enterprise DAS

Warehouses and logistics

Coverage for phones and handhelds across metal-heavy floors. Warehouse DAS

Government and education

ERRCS and cellular for public buildings and campuses.

Multi-tenant property

Coverage that serves every tenant's carrier.

Venues and casinos

Capacity for dense crowds and back-of-house operations.

How it works

How a DAS project runs

RF survey and design

Measure every carrier and public safety channel, then design antenna placement, cabling and head-end.

Weeks 1 to 3

Approvals and install

Carrier and permit coordination, then antenna, cable and amplifier installation alongside other trades.

Weeks 3 to 10

Acceptance testing

Grid testing for each carrier and ERRCS acceptance testing with the fire authority.

Closeout

Timeline

How long it takes

A single-building passive DAS typically takes 2 to 4 weeks from survey to final testing. Larger active systems, or projects waiting on carrier approvals, can take 6 to 12 weeks or more. ERRCS timing often depends on the fire authority's inspection schedule, so we plan it early. For budgeting detail, see the DAS installation cost guide.

ERRCS

What ERRCS projects involve

  • Initial test: a radio coverage test shows whether the building needs a system at all.
  • Design and permit: drawings and calculations submitted to the fire authority.
  • Installation: amplifiers, antennas, cabling and required monitoring connections.
  • Acceptance test: grid testing witnessed or reviewed by the fire authority.
  • Annual testing: most jurisdictions require yearly retesting to keep the system in compliance.

Cost

What drives DAS cost

FactorWhy it matters
Square footage and floorsMore area means more antennas, cable and labor
ConstructionConcrete, steel and low-E glass need more antennas
Carriers coveredEach carrier adds signal sources and approvals
Passive vs activeActive systems cost more but cover large buildings consistently
ERRCS bandsPublic safety frequencies vary by jurisdiction

FAQ

DAS questions

Does WCC install DAS in Los Angeles?

Yes. WCC designs and installs cellular DAS and ERRCS across Los Angeles and Los Angeles County, from RF survey through acceptance testing.

Is ERRCS required in Los Angeles?

Many Los Angeles County jurisdictions, including the City of Los Angeles, require emergency responder radio coverage in buildings where first responder signal is inadequate. Requirements vary by building and jurisdiction, so we confirm them with the fire authority.

How much does DAS cost in Los Angeles?

Cellular DAS typically runs $2 to $4 per square foot and ERRCS $1 to $3 per square foot, depending on the building, carriers and system type.

Which carriers does a DAS cover?

Our designs typically cover AT&T, Verizon and T-Mobile, with coverage tested for each carrier at closeout.

Do carriers need to approve a DAS?

Yes. Systems that rebroadcast carrier signal need carrier consent and must meet FCC rules. WCC coordinates those approvals.

How long does a DAS installation take?

About 2 to 4 weeks for a single-building passive system, and 6 to 12 weeks or more for larger active systems or projects waiting on approvals.

Does an ERRCS need annual testing?

In most jurisdictions, yes. Emergency responder radio systems are typically retested every year to stay in compliance with the fire code.